There is no single price for this work, because structural requirements differ considerably between properties. Two houses on the same street can need different support.

What follows is a useful set of guide ranges, and — more importantly — what makes a quote go up or down.

Breakdown

What you are actually paying for

Typical building work

The parts a builder would normally price. Not every job includes all of them.

Ground-floor removal

£1,500–£3,000

One breast removed, support installed, opening left ready for plastering.

Multi-floor removal

£3,500–£7,000+

Two or more floors of masonry, more support, making good in each room.

Chimney stack removal

£1,800–£4,000+

Taking the stack down and making the roof watertight. Usually needs scaffolding.

Full structural removal

£5,500–£9,500+

Breast and stack throughout, roof works and structural support combined.

Making good / plastering

£450–£1,500+

Plastering the opening, ceiling and floor repairs, skirting and decorating are often separate.

Scaffolding where required

£600–£1,600+

Depends on height, access and how long it stays up.

Possible additional professional and regulatory costs

These sit alongside the building work and are sometimes quoted separately, or paid by you directly.

Structural engineer

£350–£800

Site visit and calculations for the support design.

Building Control

£300–£700

Local authority or approved inspector fees and inspections.

Party Wall costs, if applicable

£700–£1,500+ per surveyor

Only relevant where the work engages the Party Wall process. Often avoidable if the neighbour agrees in writing.

Guide prices only. Final quotations depend on inspection and project requirements.

Cost variable

How property type shifts the price

Choose the closest match to see where the complexity usually sits.

Usually the most involved for approvals

The breast normally sits against a wall shared with a neighbour, so Party Wall considerations often apply and stacks are frequently shared. Access for waste and scaffolding can be limited at the front.

Ground floor: around £1,800–£3,200

Variables

What changes the price?

Most quote differences come down to one or more of these.

  • number of floors involved
  • what remains above the removal
  • property type and age
  • whether a party wall is involved
  • access to the room and the property
  • need for scaffolding
  • steel or support design
  • waste removal and soot
  • roof alterations where the stack goes
  • plastering and decorating
  • floor and ceiling repair
  • conservation area or listed status, where relevant

Before you choose

Comparing chimney removal quotes

The cheapest total is not always the cheapest job. Quotes for this work often differ because they include different things, so it's worth checking what sits inside each figure.

  • 01Is structural support included?
  • 02Are engineer calculations included, or arranged by you?
  • 03Is Building Control included or separate?
  • 04Is waste removal included?
  • 05Is making good included, and to what standard?
  • 06Is scaffolding included?
  • 07Who coordinates inspections?
  • 08What happens if additional structural work is discovered?

Free homeowner resource

Before You Remove a Chimney Breast

A Plymouth homeowner checklist

A simple one-page checklist covering the main things worth checking before you request quotes or start work. No email address needed — it opens straight away.

Next step

Want a figure for your own property?

Tell us roughly what you're hoping to remove and where the house is. If it's straightforward we can often give you a realistic range before visiting.